Everything you never knew you wanted to know about the Mercury Project

LJ-1

From RixWiki

Jump to: navigation, search
Project Mercury Missions
Hoss's Brother
Flight Order
LJ-1 12 Aug 1959
BJ-1 9 Sep 1959
LJ-1A 4 Nov 1959
LJ-2 4 Dec 1959
LJ-1B 21 Jan 1960
Beach Abort 9 May 1960
MA-1 29 Jul 1960
LJ-5 8 Nov 1960
MR-1 21 Nov 1960
MR-1A 19 Dec 1960
MR-2 31 Jan 1961
MA-2 21 Feb 1961
LJ-5A 18 Mar 1961
MR-BD 24 Mar 1961
MA-3 25 Apr 1961
LJ-5B 28 Apr 1961
MR-3 5 May 1961
MR-4 21 Jul 1961
MA-4 12 Sep 1961
MA-5 29 Nov 1961
MA-6 20 Feb 1962
MA-7 24 May 1962
MA-8 3 Oct 1962
MA-9 15-16 May 1962

Description of Mission

From SP-45 Mercury project summary


The flight test program was initiated with the Little Joe 1 research-and-development mission that was scheduled for July of 1959. The actual launch attempt came in the following month, on August 21, at the NASA launch site, Wallops Station, Va. A nearly catastrophic failure occurred at a time late in the launch countdown as the vehicle battery-power supply was being charged. At this time, the escape-rocket sequence was unintentionally initiated and the spacecraft was separated from the launch vehicle and propelled into the air as in a pad-abort sequence. The escape sequence was accomplished correctly, though initiated by a fault. The tower was jettisoned properly, the drogue parachute was deployed as it should have been, but the main parachute deployment circuitry was not activated because of a lack of sufficient electrical power. The spacecraft was destroyed on impact with the water. The cause of the failure was determined by detailed analyses to be a "backdoor" circuit which permitted the launch-escape system to be activated when a given potential had been supplied to the battery by ground charging equipment. The launch vehicle, though fully loaded with six solid-propellant rocket motors, was left undamaged on the launcher.