MA-3 Liftoff
Flight Order
LJ-1 12 Aug 1959
BJ-1 9 Sep 1959
LJ-1A 4 Nov 1959
LJ-2 4 Dec 1959
LJ-1B 21 Jan 1960
Beach Abort 9 May 1960
MA-1 29 Jul 1960
LJ-5 8 Nov 1960
MR-1 21 Nov 1960
MR-1A 19 Dec 1960
MR-2 31 Jan 1961
MA-2 21 Feb 1961
LJ-5A 18 Mar 1961
MR-BD 24 Mar 1961
MA-3 25 Apr 1961
LJ-5B 28 Apr 1961
MR-3 5 May 1961
MR-4 21 Jul 1961
MA-4 12 Sep 1961
MA-5 29 Nov 1961
MA-6 20 Feb 1962
MA-7 24 May 1962
MA-8 3 Oct 1962
MA-9 15-16 May 1962

Description of Mission

From SP-45 Mercury project summary


The Mercury-Atlas (MA-3) mission was accomplished on April 25, 1961, from the Cape Canaveral test site. The planned flight, which was intended to orbit an unmanned production spacecraft once around the earth, was terminated about 40 seconds after lift-off by range-safety action when the launch vehicle failed to roll and pitch over into the flight azimuth. The spacecraft was aborted successfully as the result of the command signal and was quickly recovered. The spacecraft came through the abort maneuver with only minor damages. The performance of all spacecraft systems was generally satisfactory throughout the short flight. The spacecraft used on this mission was the eighth production unit. The launch vehicle, Atlas 100-D, had increased skin thickness in the forward end of the lox tank and had the abort sensing and implementation system installed for closed-loop operation. Analysis of records indicated that there was an electrical fault in the launch vehicle autopilot. Subsequent action resulted in closer examination of electrical components and connections. == Mercury Atlas 3 Gallery