Project Mercury Missions
MR-1 "Liftoff"
Flight Order
LJ-1 12 Aug 1959
BJ-1 9 Sep 1959
LJ-1A 4 Nov 1959
LJ-2 4 Dec 1959
LJ-1B 21 Jan 1960
Beach Abort 9 May 1960
MA-1 29 Jul 1960
LJ-5 8 Nov 1960
MR-1 21 Nov 1960
MR-1A 19 Dec 1960
MR-2 31 Jan 1961
MA-2 21 Feb 1961
LJ-5A 18 Mar 1961
MR-BD 24 Mar 1961
MA-3 25 Apr 1961
LJ-5B 28 Apr 1961
MR-3 5 May 1961
MR-4 21 Jul 1961
MA-4 12 Sep 1961
MA-5 29 Nov 1961
MA-6 20 Feb 1962
MA-7 24 May 1962
MA-8 3 Oct 1962
MA-9 15-16 May 1962

Description of Mission

From SP-45 Mercury project summary


The Mercury-Redstone 1 (MR-1), which was to provide qualification of a nearly complete production spacecraft number 2, in flight with a Mercury-Redstone launch vehicle, was attempted on November 21, 1960, at the Cape Canaveral launch site. The mission was not successful. At lift-off, the launch-vehicle engine was shut down and the launch vehicle settled back on the launcher after vertical motion of only a few inches. The spacecraft also received the shutdown signal and its systems reacted accordingly. The escape-rocket system was jettisoned and the entire spacecraft landing system operated as it had been designed.