Everything you never knew you wanted to know about the Mercury Project

MR-1A

From RixWiki

Jump to: navigation, search
Project Mercury Missions
MR-1A Liftoff
Flight Order
LJ-1 12 Aug 1959
BJ-1 9 Sep 1959
LJ-1A 4 Nov 1959
LJ-2 4 Dec 1959
LJ-1B 21 Jan 1960
Beach Abort 9 May 1960
MA-1 29 Jul 1960
LJ-5 8 Nov 1960
MR-1 21 Nov 1960
MR-1A 19 Dec 1960
MR-2 31 Jan 1961
MA-2 21 Feb 1961
LJ-5A 18 Mar 1961
MR-BD 24 Mar 1961
MA-3 25 Apr 1961
LJ-5B 28 Apr 1961
MR-3 5 May 1961
MR-4 21 Jul 1961
MA-4 12 Sep 1961
MA-5 29 Nov 1961
MA-6 20 Feb 1962
MA-7 24 May 1962
MA-8 3 Oct 1962
MA-9 15-16 May 1962

Description of Mission

MR-1A was a repeat of the failed MR-1 mission, which failed after the booster shut down after only a few inches of motion. From SP-45 Mercury project summary


Analyses of the cause of malfunction showed the problem to have been caused by failure of two ground umbilicals to separate from the launch vehicle in the proper sequence. In the wrong sequence, one umbilical provided an electrical path from launch-vehicle power through blockhouse ground and the launch-vehicle engine cut-off relay coil to launch-vehicle ground that initiated the cut-off signal. Except for loss of expendable items on the spacecraft, such as the escape system and the parachutes and the peroxide, the spacecraft was in flight condition. The launch vehicle was slightly damaged in the aft section by recontact with the launcher The spacecraft and launch vehicle were demated. The launch vehicle was replaced by another Mercury-Redstone launch vehicle, and the spacecraft was again prepared for its mission. Modifications included a long ground strap that was placed between the launch vehicle and the launcher to maintain electrical ground until umbilicals had been separated. The refurbished spacecraft and new Mercury-Redstone launch vehicle were launched successfully as mission MR-1A on December 19,1960. At this time, all test objectives were met. All major spacecraft systems performed well throughout the flight. The launch-vehicle performance was normal except for a higher than nominal cut-off velocity. The only effects of this anomaly were to increase the range, maximum altitude, and maximum acceleration during reentry. The spacecraft was picked up by a helicopter 15 minutes after landing and was delivered back to the launch site on the morning after the launch. ---

More Information

see: Spacecraft 2A, MR-1