Everything you never knew you wanted to know about the Mercury Project

Spacecraft 3

From RixWiki

Jump to: navigation, search
Production Mercury Spacecraft
Mercury Spacecraft
Flown Spacecraft
SC 1 9 May 1960
SC 4 29 Jul 1960
SC 3 8 Nov 1960
SC 2 21 Nov 1960
SC 2A 19 Dec 1960
SC 5 31 Jan 1961
SC 6 21 Feb 1961
SC 14 18 Mar 1961
SC 8 25 Apr 1961
SC 14A 28 Apr 1961
SC 7 5 May 1961
SC 11 21 Jul 1961
SC 8A 12 Sep 1961
SC 9 29 Nov 1961
SC 13 20 Feb 1962
SC 18 24 May 1962
SC 16 3 Oct 1962
SC 20 15-16 May 1962
Unflown Spacecraft
SC 10 SC 12
SC 15 SC 15A
SC 15B SC 17
SC 19

Contents

Mission

Spacecraft 3 flew on LJ-5

Disposition

Destroyed at Launch

Details

Some of the changes between Capsule 5 and the contemporaneous specification capsule were called out in

Instrument Panel

Pending any new information in the February 1961 Edition of SEDR-104 or the August 1961 Edition of SEDR-104, Figs IP-1, IP-2, and IP-3 represent the SEDR-104 diagrams for the main instrument panel, and the left and right consoles of capsule 3.

Chronology

15 December 1959 
The December 1959 Edition of SEDR-104 is published containing this Spacecraft as a test capsule
29 July 1960 
Spacecraft 3 delivered to Langley Field for a noise and vibration test.
27 September 1960 
Spacecraft 3 Erected at the Wallops Island launch site for the Little Joe 5 (LJ-5) mission.
8 November 1960 
LJ-5 Launched
1 February 1961 
The February 1961 Edition of SEDR-104 is published presumably containing this Spacecraft.
1 August 1961 
The August 1961 Edition of SEDR-104 is published presumably containing this Spacecraft.
Personal tools