Everything you never knew you wanted to know about the Mercury Project

Spacecraft 9

From RixWiki

Jump to: navigation, search
Production Mercury Spacecraft
Mercury Spacecraft
Flown Spacecraft
SC 1 9 May 1960
SC 4 29 Jul 1960
SC 3 8 Nov 1960
SC 2 21 Nov 1960
SC 2A 19 Dec 1960
SC 5 31 Jan 1961
SC 6 21 Feb 1961
SC 14 18 Mar 1961
SC 8 25 Apr 1961
SC 14A 28 Apr 1961
SC 7 5 May 1961
SC 11 21 Jul 1961
SC 8A 12 Sep 1961
SC 9 29 Nov 1961
SC 13 20 Feb 1962
SC 18 24 May 1962
SC 16 3 Oct 1962
SC 20 15-16 May 1962
Unflown Spacecraft
SC 10 SC 12
SC 15 SC 15A
SC 15B SC 17
SC 19

Contents

Mission

Spacecraft 9 flew on the MA-5 mission which carried Enos

Disposition

North Carolina Museum of Life and Science, Durham, North Carolina

In Jim Gerard's AFGAS

Details

Instrument Panel

Fig SC9-IP1 shows a photo which I beleive to be spacecraft 9.

Chronology

24 February 1961 
Spacecraft 9 delivered to Cape Canaveral
1 November 1961 
The November 1961 Edition of SEDR-104 is published containing spacecraft 9 as a test capsule
1 February 1962 
The February 1962 Edition of SEDR-104 is published containing spacecraft 9 as a test capsule.
29 November 1961 
MA-5 Launched
8 August 1962 
Spacecraft 9 (redesignated spacecraft 9A) was phased into the Project Orbit program in preparation for the Mercury extended range or 1-day mission.
10 January 1963 
Spacecraft 9A was cycled through Project Orbit Mission Runs 108, 108A, and 108B in the test facilities of the McDonnell Aircraft Corporation.
Personal tools